No Image
No Image
No Image
Status and Performance of the First VERITAS telescope PDF Print E-mail
Written by J. Holder and the VERITAS Collaboration   
Wednesday, 10 August 2005

Proceedings of the 29th International Cosmic Ray Conference. August 3-10, 2005, Pune, India.

 astro-ph/0507451

Abstract:  The first of the four atmospheric Cherenkov telescopes of the VERITAS array has been in operation at the Mt. Hopkins base camp since January 2005. The telescope has met all specifications. We present here a description of the technical performance, including calibration details and a summary of a preliminary analysis of Crab Nebula observations. The construction status of the complete VERITAS array is also discussed.

 
< Prev   Next >
No Image
No Image No Image No Image
No Image
Powered by Joomla! (Stable-1.0.12) | © 2006 The VERITAS Collaboration | Valid XHTML | Valid CSS
No Image